Elmsbrook Village
- Location
- Bicester, Oxfordshire
- Client
- Crest Nicholson
- Date
- March 2018 onwards
- Services Delivered
- Adoption Works, Earthworks & Enabling, Groundworks, Pre-Construction
Project Details
Elmsbrook is an eco-village development in Bicester, Oxfordshire, which commenced in March 2018 for our long-term client Crest Nicholson.
Works undertake include 2800m of foul drainage, 2259m of roads and strip foundations for 228 plots.
As this is an eco-village, there is no storm water drainage – the site is instead permeable, made possible by permeable driveways, surface water soakaways and rainwater harvesting tanks for the dwellings.
The development also includes allotments and a district heating main.
Key Info
Foul Drainage
0m
Roads
0m
Plots
0
“Carmac have worked with us on Elmsbrook Village on both Phase 1 and Phase 2 of the development. They have been a breath of fresh air as a problem solving and hard working contractor.”
Gary Neal
Build Manager, Crest Nicholson